| WeblessBlok walls with steel rebars |
The WeblessBlok is placed as the structural walls with rebar secured.

|
| Roof ready to pour |
Once the wall is completed, plumbed, and partially filled with concrete, the roof is formed and re-enforcing steel is placed
and secured, ready to pour.

|
| Roof being poured |
As the roof is poured with high-strength concrete, every effort is made to fill all gaps, leaving no places for water infiltration.

|
| Roof finishing and inspection |
Once the roof is poured, it is troweled smooth and inspected for flaws. Any flaws are corrected while the concrete is wet.
Once the concrete has cured, it is sealed with concrete/masonry sealer.
|